Alaska Map of Hamilton project

BR 1185 Sylvia Anne Marie Circle over Gate Creek

Trapper Creek, Alaska

Start Date: June 2014
End Date: July 2014
Owner: Matsu Borough

Project consisted of a new 50' single span 16' wide steel girder bridge with precast deck panels for the Matsu Borough near the town of Trapper Creek. The old bridge was removed and used as a bypass bridge for local traffic while the new bridge was constructed over Gate Creek. Work included driving 12" diameter piles, structural steel girders manufactured by HCo and shipped to AK, precast panels for backwalls and deck, minor grading work and riprap installation.